JRO Annex

IMG_4257.HEIC
IMG_4257.HEIC
IMG_4256.HEIC
IMG_4256.HEIC
IMG_4176.HEIC
IMG_4176.HEIC
IMG_4165.HEIC
IMG_4165.HEIC
IMG_4124.HEIC
IMG_4124.HEIC
IMG_4074.HEIC
IMG_4074.HEIC
IMG_4058.HEIC
IMG_4058.HEIC
IMG_4043.HEIC
IMG_4043.HEIC
IMG_4014.HEIC
IMG_4014.HEIC
IMG_3819.jpg
IMG_3819.jpg
IMG_3803.HEIC
IMG_3803.HEIC
IMG_3820.jpg
IMG_3820.jpg
IMG_3819.jpg
IMG_3819.jpg
IMG_3803.HEIC
IMG_3803.HEIC
IMG_3800.HEIC
IMG_3800.HEIC
IMG_3734.HEIC
IMG_3734.HEIC
Screen Shot 2020-12-24 at 10.58.13 AM.png
Screen Shot 2020-12-24 at 10.58.13 AM.png
IMG_3607.HEIC
IMG_3607.HEIC
IMG_3599.HEIC
IMG_3599.HEIC
IMG_3583.HEIC
IMG_3583.HEIC
IMG_3580.HEIC
IMG_3580.HEIC
IMG_3576.HEIC
IMG_3576.HEIC
IMG_3567.HEIC
IMG_3567.HEIC
Screen Shot 2020-12-16 at 12.09.23 PM.png
Screen Shot 2020-12-16 at 12.09.23 PM.png
IMG_3511.HEIC
IMG_3511.HEIC
IMG_3508.HEIC
IMG_3508.HEIC
IMG_3507.HEIC
IMG_3507.HEIC
IMG_3485.HEIC
IMG_3485.HEIC
IMG_3483.HEIC
IMG_3483.HEIC
IMG_3618.HEIC
IMG_3618.HEIC
IMG_3442.HEIC
IMG_3442.HEIC
IMG_3431.HEIC
IMG_3431.HEIC
IMG_3467.HEIC
IMG_3467.HEIC
Insulation arrived (under the brown tarp) Steel raised panel door.
Insulation arrived (under the brown tarp) Steel raised panel door.
Initial materials...  PT foundation, framing (75x 2x4's), plywood, T-111, trim
Initial materials... PT foundation, framing (75x 2x4's), plywood, T-111, trim
Dec 10, 2020
Dec 10, 2020

This 10x8 shed will become the home for everything that does not need to be out under the stars at night.  All my adapters, extra equipment, boxes, cases etc. will move into this new shed that I will build under the roll-off structure. This new shed will be insulated and will allow for more space in the observatory and less exposure to moisture for a lot of things.  It will also have automated snow removal for the roof so that I can still roll off the roof without plowing it if there is more than a couple of inches of snow.  I needed to do a relatively flat roof 1x12 pitch in order to be able to stand up since it was built on grade.


13-Feb:     I finally have all the trim, but i have already started the migration.

30-Jan:     Completed Wallboard installation, installed floor tiles

25-Jan:     Ready for 1-3" of snow for a good roof heater test!

24-Jan:     Started wall board installation, removed remaining materials, started spreading stone

18-Jan:     Completed insulation installation, vapor barrier on 2 walls

17-Jan:     Roof snow removal system installed.  

16-Jan:     Started insulation installation

15-Jan:     Electric complete

10-Jan:     Door installed

5 - Jan:     Electrical rough in complete

4 - Jan:     Hang panels, fan, outside light fixture and all outlet boxes

29-Dec:     Install vinyl siding, trim out front, adjust temp door

28-Dec:     Install beam flashing, adjust door width, install siding trim and prep for front siding

27-Dec:     Install roof

26-Dec:     Make front and rear sofits

23-Dec:     Sided the back, made temp door

22-Dec:     Front wrapped, Installed the corners, window and 2 sides of T1-11

21-Dec:     Front covered in plywood

18-Dec:     The build is stalled now.  I'm still digging out from 12" of snow.

10-Dec:     Begin build December 10, 2020

The "why"

Snowstorm DeIcing pics